According to the report, countries clearly put forward non-fossil energy by 2015 and 2015 respectively accounted for 11.4% and 11.4% of the total primary energy consumption of goals.In order to ensure the production and use of renewable energy, passed in 2005 clearly carbon steel spiral welded tube stipulated in the "renewable energy law" for power grid enterprise priority scheduling and fully guarantee the specific measures for acquisition of renewable energy power generation ", but the law enforcement inspection group of the NPC standing committee in the place of the research shows that a lot of places in the implementation of the policy "less".
According to the industry terms, is the "wind" phenomenon is serious.Report revealed that, at present, the domestic wind power, photovoltaic power generation, water and electricity are ANSI B16.9 A234 WPB 180 Deg Elbow sent out and given problems, abandon the wind, in 2012 to reach 2012 KWH, accounting for about 17% of the actual power."Three north" area rich in wind resources power brownouts are especially serious, year average hours using a dramatic drop in wind power, jilin from 1941 hours in 2010 fell to 2012 in 1420 hours, more than 40% some local wind power electricity, to enterprise management difficulties.
The emergence of "wind" problem report to the a53 SCH40 steel pipe for ship building department responsibility implementation does not reach the designated position. Since law promulgated, related regulations about full of indemnificatory acquisition system is still not issued, power grid enterprises buying power, not according to stipulations power regulator, weak supervision. "And at the same time, between regions, the interests of the relationship between enterprise also restricts the full protection of acquisition system implemented." The report said.
And at the time of the local research committee of the National People's Congress (NPC) law enforcement inspection group found that due to hasn't been implemented in many parts of the energy-saving power generation dispatching, still USES the annual electricity production plan management, result in renewable energy power generation unit in the thermal power unit.
And part of the power grid companies do not even according to the legal requirements for small grid-connected renewable energy sources such as water and electricity to provide related services, skimp on the Internet, even by the costs of interconnection of power enterprises exist for a long time."Full guarantee law. It is clearly written in the renewable energy law, don't make it as a symbol, it is a substantive provisions." Participate in group review s member said.How to solve the problem of full indemnificatory acquisition system can be born?
Report gives the solution including: the national development and reform commission, the national energy administration should strengthen the renewable energy and related planning as a whole, a national power grid development planning as soon as possible, strengthen the construction of form a complete set of power grid and inter-province output channels, improve given, transmission capacity, ensure the renewable energy development, delivery, use of multiple links health, coordinated development.In addition, technological innovation is also seen as the tool to break the existing pattern."In fact, the acquisition of renewable energy, from the grid and the great efforts of all aspects, in order to guarantee priority scheduling, the full safeguard, to strengthen the improvement of the protection measures, including research and development to keep pace with science and technology, to solve the technical bottleneck problem." S member said.
The report also suggested that establishing distributed renewable power grid technology supporting system and management mechanism, to realize direct for distributed generation and no discrimination, barrier-free access to power grid, to encourage renewable energy scattered development and given on the spot.
没有评论:
发表评论